ST GEORGE'S CLOSE

KEY INFORMATION

Location: Sheffield

Client: North Midland Construction

Value: £2.6 million

Duration: 45 weeks

PROJECT DESCRIPTION

Awarded by new client North Midland Construction, the concrete works are underway at St. George’s Close, Sheffield

St George's Close contains a mix of Studios and Clusters, both ensuite and shared bathrooms, with 257 student accommodation units over 17 storeys.

The design comprises of a podium and a tower which will become a prominent landmark along Netherthorpe Road, close to the University of Sheffield buildings. The frame is a traditional reinforced concrete design utilising Bamtec reinforcement, with the concrete works are programmed to be complete in March 2019.

UNIQUE FEATURES

  • King post wall retention system to site perimeter and 4 metre deep core base.
  • BAMTEC reinforced slabs.