It’s been a monumental effort by all involved on what was a very challenging build, on such a tight site with many logistical challenges, a keen programme and a very detailed high quality concrete specification.  The standard of workmanship is exceptional and has wowed many visitors to the site including our Client Muse Developments and the end user South Tyneside Council.  You assembled a very skilled and high calibre workforce on site who cooperated with our requirements throughout maintaining high standards in all aspects from start to completion, so many thanks to all of them and more specifically to your site supervisor Scott Rodgers who lead this team very well.

I hope we have the opportunity to work together again in the not too distant future.

John Osborne

Senior Project Manager

Bowmer & Kirkland

On the X1 Aire project, Cidon performed to a very high standard in a totally professional manner.  The quality of work produced was excellent, which was achieved whilst maintaining a very fast floor to floor cycle.  This enabled Cidon to complete ahead of programme.  The quality of staff and operatives was excellent; they displayed a professional and proactive attitude to design and construction issues.  An exceptionally good working relationship developed between Cidon and Bardsley site teams which contributed greatly to the overall benefit of the project.  The health and safety performance throughout the project was sustained at the highest level and must be commended. 

Ian Hassard

Senior Project Manager

Bardsley Construction

Studio Libeskind appreciated being offered the chance to actively review reference projects with Cidon, Interserve and Arup. This supported the design team in optimising the mixes, shuttering types and placement methodologies for the visible concrete that is so important in this award winning job.

Wendy James

Partner

Garbers James

I am writing with reference to the completed Spire Healthcare Scheme, in particular the scope of works carried out by Cidon Construction.

Cidon Construction were awarded the concrete frame and enabling works package for a £35m private healthcare scheme in Didsbury, Manchester.

I would like to congratulate Cidon Construction on the successful conclusion to their subcontract package works. Their overall performance and subsequent contribution to the project cannot be underestimated.

Their approach and management of the works is testament to their professionalism and proactive attitude to matters both Construction and Fiscal. The Health & Safety performance on what is a complex project can only be commended.

I look forward to the opportunity to work with Cidon Construction on future schemes.

John Fowler

Project Manager

Vinci Construction

I have had the opportunity of working with Cidon on the South London EfW in Croydon. Cidon delivered a very complex and challenging project to a tight programme. They were proactive in offering construction and design advise for the benefit of the wider project and the technical understanding shown by their site team was exceptional. Overall a very professional and successful project for all involved.

Commercially we were always kept informed of any changes and these were well presented and agreed in a timely manner.

I would be happy to recommend Cidon to anyone considering a concrete works package.

Alison Powell

Regional Commercial Manager

Lagan Construction

 

Following our client's late withdrawal of the previously agreed lightweight steel frame solution, we were delighted at Cidon's professional approach with a "can do" attitude which resulted in the concrete frame design being completed, materials procured and work commencing on site in a very short timeframe.  This ensured that our construction works were able to commence on time and any delays to programme avoided.    Both the site team and project management team proved to be very helpful and knowledgeable, often offering value engineered solutions for various challenges that were faced on site, along with an exceptional Health and Safety culture which ultimately led to a successful project completion. 

 

Joe Dickinson

Managing Quantity Surveyor

Keepmoat (Regeneration)

I have had the opportunity of working with Cidon Construction on two projects, namely Cleveland EFW and Ferrybridge EFW. On each project, Cidon Construction have taken control of very challenging and complex operations, and delivered each successfully, whilst maintaining their control on HSE, quality and programme. Cidon Construction has a management and site staff of exceptional talent and experience that are adaptable and dependable, an asset to any project.

Alan Flynn

John Sisk & Son
Cleveland EFW / Ferrybridge EFW

I write to express our thanks for the works undertaken by Cidon Construction here at Student Castle Walmgate. The concrete frame works have progressed and been completed in a manner that is worthy of praise. The works were completed ahead of time and Cidon were instrumental in making this possible. This was achieved by assisting and providing services to overcome issues with the design and construction. The construction was managed pro-actively and safely, joined with a good working relationship formed between Cidon and Vinci site teams made this possible. The approach by Cidon has been welcomed by the team here at Vinci and we look forward to opportunities to work together in the future.

Andrew Whaley

Senior Project Manager
Vinci Construction

I am writing to wholeheartedly recommend Cidon Construction to perform high-quality concrete construction. The finish to the exposed walls, we worked alongside Cidon and Sir Robert McAlpine through an extensive mock-up process in which they provided invaluable input. Three Driven Voids, 6M diameter hollow concrete cylinders which extend 30M up through the building and tilt 12 degrees to provide structure, natural ventilation and light through the centre of the building. The steel shutters, along with the self-consolidating concrete they specified, along with their exceptional placement technique provided a concrete finish as smooth as silk. They used one floor-high outer cylindrical shutter, and two inside shutters to permit the sequencing to hop from one void to the next continuously. Each is carved out with rectangular openings oblique to the tube, created curved shapes which were blocked-out with CNC milled plywood. The openings have the crispest edges and profiles I have ever seen in concrete.

Chris McVoy

Steven Holl Architects 
Glasgow School of Art, Seona Reid Building

On all four projects, Cidon have performed to a very high level. The quality of the work produced is excellent. On the two basement contracts, their ability to manage the significant temporary works was commendable. The quality of staff and operatives provided is high which contributes significantly to the service provided. In terms of organisation on site and ability to provide and keep to a programme Cidon's performance has been very good. All four sub contracts have finished ahead or on programme. Commercially, Cidon Construction are fair and reasonable in all dealings. In respect to Health and Safety, I have no concerns over the way Cidon have conducted their business either directly on site or in the preparation of documentation. I would have no hesitation in recommending Cidon Construction to anyone considering to use them on concrete works.

Bruce McEwan

Sir Robert McAlpine 
Quartermile - Four Phases

On behalf of myself, our site team and Tolent Construction we would like to take this opportunity to express our gratitude for the rapid and efficient progress made during the erection of the concrete frame for the tower block at Eastern Boulevard Leicester, which has now been named "The Summit". We would all like you to pass on our thanks to the site team, who played such a pivotal role in driving the programme and additional technical and safety support provided throughout the scheme from the rest of your management team. Cidon’s programme turnaround, by improving the floor to floor cycles and the innovative introduction of the precast concrete columns gave us a great spring board to achieve success with our own works. We could not have wished for a better starting platform. It was also pleasing to note the final account settled to our mutual satisfaction so quickly and fairly.

Ian Pratt

Tolent Construction Ltd
The Summit